Deploying a Pylon
Munshiganj District in Bangladesh
Tent
Sarah Calibrates in the tent
before and after deploying
About to deploy
Pylon Construction
Enclosure
Pylon Column
Sensor Cables
Motes in enclosure
Pylon
Pylon to Field
Deployed pylon
Placing Sensors
Placing Sensors
Checking first pylon
Walking through burm
Sheema and Pylon
Working
Pylon and sensor cable
Attaching Solar Panel
DSCN1544.JPG
Digging Holes
More digging
Mud goes in bucket
Holes + Temp sensor
Pylon with cables
Pylon
Connectors in mud
DSCN1589.JPG
Base-station
Base-station
Walking to site
car-batter + stargate
Checking network
Checking network
Sha-alom and Sarah
Hole
Holes became undug
Joseph, Rajive
Calibration at BUET
digging holes
Sam, Elke, Kai in back.JPG
Preparing Pylon 3
Prof Ali
Pulling sensors out
Pylon 1 and 2
Pylon 2 Extra cable
Pylon 2
Pylon 3 EXTRA cable
Pylon 3.JPG
Calibration in Tent
Tent
Tent Work
Connectors
Excess cables
Tent
Connectors in mud
Pylon 2
Mud
Wires/Connectors
Cement ring keeps holes dry